A list of countermeasures for specific sections with estimated costs and expected effect: how many lives and serious injuries each solution will save and in what order to implement it.
Funding for safety is always limited. The investment plan shows which countermeasures deliver the greatest effect per tenge invested and helps justify the budget to management, the akimat or a development bank.
The plan is based on the results of an iRAP assessment, so each solution is tied to a specific section and to the risk for a specific group of road users.
We use the iRAP assessment results for the sections or carry out the assessment as part of the work.
We agree with the client the cost of typical works based on local rates.
For each countermeasure we calculate the cost, the fatalities and serious injuries prevented and the benefit-cost ratio.
We develop plan options for different budgets and timeframes and show the Star Rating before and after.
We hand over the plan and the materials to justify the budget and support implementation.
For economic calculations the Institute has its own development - the "Express Methodology for Calculating the Average Statistical Value of a Life Lost in a Road Crash", entered in the State Register of Rights to Copyright Objects in 2024.
Implementation of the iRAP international road safety assessment system in Kazakhstan
A project to implement the iRAP methodology in Kazakhstan. The network was surveyed with a specially equipped vehicle and road attributes were coded every 100 metres; based on the coding, sections are given a Star Rating and an investment plan is prepared.
More about the project
Shymkent: strategic road safety meeting with iRAP experts
The meeting was held as part of the development of the Road Safety Strategy of the Republic of Kazakhstan. At a round table with the local authorities, police and transport services, participants identified priority steps to reduce crashes on the city's roads.
More about the project