Research on traffic flow and road safety, draft regulatory and methodological documents, and evidence-based proposals for government bodies.
Road safety decisions should be based on data and proven methods. The Institute conducts research, prepares draft standards and methods and takes part in sector research platforms.
The Institute is accredited by the Ministry of Science and Higher Education of the Republic of Kazakhstan as an entity engaged in scientific and scientific-technical activities and can take part in competitions for research projects.
We agree the research question, the requirements for the output and the timing.
We define the methods, data sources and stages.
Field surveys, statistics, review of international practice.
A report, a draft document or an analytical note.
We present the results to the client and to the relevant working groups.
Participation in drafting the departmental standard "Road Safety Procedures" commissioned by the Committee for Roads of the Ministry of Transport
Participation in the "Transport Science" working group of the National Academy of Sciences of Kazakhstan
Certificate for the KazRAP S software for comprehensive research on road condition and road safety
Participation in the technical committees of the Transportation Research Board (USA) as an affiliate member
Departmental standard "Road Safety Procedures"
A draft departmental standard "Road Safety Procedures" is being developed on assignment from the Committee for Roads of the Ministry of Transport. The Institute takes part in the work, including the exchange of experience with Swedish specialists.
More about the project
The KazRAP programme and KazRAP S software
The Institute's own programme for assessing the safety of Kazakhstan's roads. In 2025 the Institute registered the KazRAP S software product and signed an updated memorandum with KazAvtoZhol National Company JSC on implementing the programme on national roads.
More about the project
Describe the road section or network and the result you need - we will prepare a proposal on the scope of work and timing.
Describe the task - network length, road type and the required output. We will reply within one working day.